APA

OSH 5302 Unit III Project

As the environmental health and safety (EHS) professional for a manufacturing company, you have just completed the quarterly inspections and have found hazards. Because your resources (both financial and human) are limited, you mu...

Order #SA-13619CompletedCompleted on Apr 10, 2024
$70.00 USD
Order value
Order a similar assignment

Assignment details

Academic level
Masters level
Subject
General
Length
8 pages
Deadline
Not specified
Citation style
APA
Bids received
0

Project description

As the environmental health and safety (EHS) professional for a manufacturing company, you have just completed the quarterly inspections and have found hazards. Because your resources (both financial and human) are limited, you must complete a risk assessment to determine which hazards have a higher priority for mitigation.

Use the quantitative risk assessment method outlined in the unit lesson and explain why this method is the best choice for assessing the risks associated with the hazards and the purpose of your project:

Read the Unit 3 Study Guide and required reading assignment, then review all previous grading feedback and the Writing Style Instructions announcement before drafting your work.

(a) Review each of the hazards identified below and conduct a risk assessment using the quantified method for risk assessment. Click here to access the quantitative risk assessment form and make certain to include the entire completed spreadsheets in the appendix (directly following the References page; cite Brauer (2023) for the risk matrix and the HRN calculation equation). *Delete the sample Condition #1 and sample quantitative values in the risk assessment spreadsheet and replace with Hazard #1 conditions and establish quantitative values, then add the subsequent Hazards (#2 - #7) as to complete the entire risk assessment.

(b) You may modify the risk level in the spreadsheet to meet your level of acceptable risk. Based on this quantified risk assessment, determine the priority of mitigation.

(c) Provide a four-to-eight-page report (not including the required title page and appendices page; see CSU Citation Guide p. 19) detailing your findings. The project report should include the elements listed below:

Summarize the steps you used to determine your risk assessments, including conducting a hazard identification inspection.

Provide an explanation as to why the quantitative risk assessment method is one of the better methods for evaluating risk for this type of hazard.

Discuss the results of the findings, including the priority of mitigations for the identified hazards.

Provide a recommendation as to whether the project mitigations are justified using the William-Fine method, showing all calculations in the appendix, and citing Brauer (2023) for the equations used (Brauer, 2023, pp. 552-553).

Requirements

  • 8 pages
  • Formatted and referenced in APA
  • Academic level: Masters level
  • Subject: General

Delivered file

This file is available to the student only

For privacy and security, delivered files are not available for public download. The student who placed this order can sign in to access the delivered work from their dashboard.

Writer information

Writer profile avatar
joythetutor ✓ Verified
★ 5.0/5 (0 reviews)
View profile →
100%Success rate
0Completed orders
—Qualification

Need a similar assignment?

Post your assignment and receive offers from verified writers in your subject area.

Post a new assignment Back to latest orders